Patent Application Number: 2007333518
Filing Date: September 11, 2007Priority Date: December 08, 2006
Inventors: Alith Kumar, Glenn Robert Shaffer
Applicants: General Electric Company
View Prior Art for Claim 8

The system according to claim 7, wherein during the trip the track characterization element provides at least one of updated track segment information and updated train information to the database.

#60Vision For The Future
Applies to Claims 1,14,19,25,29,30,4,7,8
Submitted by: Jimmy TiLast updated: about 1 year ago
Title Vision For The Future
Description
Slides from a presentation by Steve Ditmeyer, National Defense University that talks about the future of railroad system. Throughout the slides, it is evident that the model he discussed resembles very closely to the system discussed in the application, with the exception that most sensors in the model are on the track rather than the train.
0 thumbs up 0 thumbs down
Annotations(0)
#61Integrated Railroad System
Applies to Claims 1,10,11,14,15,19,20,21,25,26,27,30,4,5,7,8
Submitted by: Jimmy TiLast updated: about 1 year ago
Patent/Application # 2003/0236598
Description
Railroad traffic control system that links each locomotive to a control center for communicating data and control signals. Trains have onboard computers, sensors and two-way communication devices, information from sensors are transmitting to the control center and schedule are transmitted to trains. Although the sensor are lacking in variety compared to the application, the whole architecture and concept of a network-centric railroad system are almost identical.
0 thumbs up 0 thumbs down
Annotations(0)